 |
 |
 |
| 55 Tons Winch to India |
75 Tons Cable Storage for Castoro 8 |
75 Tons for Semac 1 |
 |
 |
 |
| 102 Tons Pressure Vessel from Hamburg to Dalian |
250 Tons Crane for Vladivostok |
600 Tons Crawler Crane for Indonesia |
 |
 |
 |
| Cargoes Stuffed & Lashed Securely and Safely |
Logging Truck to Tema |
Weatherford : Jacked up 90 Ton Compressor to Low Loader onto Barge for Overside Loading |
 |
 |
 |
| Machine |
Oil Field Equipments Shipped to India |
ABB Analyser Shelter Equipment to Abu Dhabi |
 |
 |
 |
| Shipment from Chevron Lae |
Saipem : Castoro 8 |
Saipem : Semac 1 |
 |
 |
 |
| Tema Oil Project |
Transformer from Thailand via Spore to Malaysia by Road |
Shipment for more than 1000 CMB Water Tanks to Damman |
 |
 |
 |
| BAT: Transported 3 Lines of Tobacco Oven Ex Spore to Karachi |
Overside Loading with 200 Tons Floating Cranes |
Shipment more than 2500 CMB of Construction Equipments to Mahe |
 |
 |
 |
| Shipment of 5 Units Quay Crane from Doosan Heavy Industries in Dalian to Singapore by Barges |
500 Ton Floating Crane to Lift 6 Units of 90 Ton Piling Equipment - Ex Spore to Nepal |
More than 100 Units of Over Length Chiller Shipped to Iran & Egypt |
 |
 |
 |
| Genset Transported by Barge to Samarinda(Indonesia) |
More than 30 Units of Gas Separators Shipped to Laem Chabang |
Hoisting & Transporting Oversized Equipments for CSPC |
 |
 |
 |
Huaneng Shantou Power Plant Project
Shantou City, Guangdong Province |
Large Scale Equipment Transport of Guiguang DC Transformer Engineering - Power Transmission Project |
3000 CBM Construction Equipment from Shanghai to Karachi |
 |
 |
 |
| Shipment from Singapore to Damman |
130 tons oilfield equipment from USA |
Thrusters from Rolls Royce Norway |
 |
 |
 |
| We handle more than 60 Yachts to Australia |
Stuffing of speed craft for Navy |
Pump Skip to Laem Chabang |
 |
 |
|
| 6 Units Thrusters each 65 tons from Norway for Sewbawang shipyard |
30m Telescopic Joint from Balikpapan to Singapore |
|